General Engineering Contractor: Tim Springsteen Brownsville, CA Lic. 874187

Home | About Us | Our Services | Customer Accolades | Contact Us | Reconstruction of Road Wash-out | Pond Work | Riding Arena | Waterway at Pond | Hillside Pad Landscape | New Gravel Road | Brush Clearing
Waterway at Pond

Controlling the spillway from the pond.

p1010004.jpg

Before photo.

p1010010.jpg

p1010011.jpg

p1010019.jpg

p1010031.jpg

p1010077.jpg

p1010079.jpg

p1010081.jpg

p1010083.jpg

The completed small pond for overflow from the large pond!

p1010007.jpg

The Eagle Talon attachment on the Skid Steer eats up the brush!

p1010008.jpg

p1010014.jpg

p1010028.jpg

p1010076.jpg

p1010078.jpg

p1010080.jpg

p1010082.jpg

p1010085.jpg